Monday, February 28, 2011

Day 14

Today all the stormwater/drainage piping was installed around the property and the frame was delivered on site.


Sunday, February 27, 2011

Day 13

a Light shower areound today not alot or rain though. No change to the site

Saturday, February 26, 2011

Day 12

No Changes to the site today... look forward to seeing what starts happening on monday

Friday, February 25, 2011

Day 11

Today saw the start of the electrical go in, with what looks like the consumer mains and telecom conduiting along with i am assuming the 3 phase cabling to go with it.







Thursday, February 24, 2011

Day 10

Into Double Figures now, and no change on the block but that was to be expected!!

Wednesday, February 23, 2011

Day 9

No Change again today, but we were informed that external drainage works will start on monday with the frame starting to go up not long after that...the red on the slab is fading as well...


SO as there is not much happening while the slab dries out here is the ground floor and what it will look like

Tuesday, February 22, 2011

Day 8 (Week 2)

This time last week the block was just freshly cut... today no real changes apart from some enviromental barriers put up.