Monday, October 31, 2011

Day 259 [+35]

Today saw the balcony get fixed (I Hope) and the waterproofing re-done ready for tiling. The tassie oak dressing was also finished on the underside..

I do Really hope it is fixed properly this time


Tassie Oak Dressing

Balcony Repair


Balcony Repair

Water Proofing

Sunday, October 30, 2011

Thursday, October 27, 2011

Day 255 [+31]

Today saw a carpenter onsite to start fitting off the door furniture also our electricity was connected the house is now alive!!


Power


Door handles


Wednesday, October 26, 2011

Day 254 [+30]

Today saw shower screens and mirrors go into our bathrooms, and they  have turned out pretty nice



Ensuite Mirror

Ensuite Shower

Main Bathroom Mirror

Main Bathroom Shower

Powder Room Mirrir

Tuesday, October 25, 2011

Day 253 (Week 37) [+29]

No work on site today, nothing was Scheduled... Lucky as it Pelted rain all day... not that it should of made a difference as there is plenty of work to be completed on the inside still.


It is going to be a busy rest of the week.. "Practical Completion" is dues next week

Watch Out - Rain Days

Watch Out

One thing that has really frustrated and Annoyed me with Metricon is the lost time due to rain days.

They Claim just about everything over 0.4mm and it doesnt matter if they did infact work on that day, if  it was a part day or a full day, external or internal work they will still claim it as there "may" or "may not" be an impact to the timeline where the rain "may" or "may not" cause a delay..

They also Claim Sundays and Public Holidays for the same reason that the rain just possibly "may" or "may not" cause a delay..

I mean they hardley even work a Saturday let alone a Sunday to even warrent claiming it as a lost time delay

It feels like just a cheap excuse to get them out of trouble..

Monday, October 24, 2011

Day 252 [+28]

Today the Brickies finished the columns, this time the top was finished alot nicer as well.. howerver the carpenter returned and did some destruction moving the gable roof timber around to accomodate the fact that it was originally bult off centre.

Latley it seems there is mor steps backwards then there are forwards...



De-construction

another fixer upper

Sunday, October 23, 2011

Saturday, October 22, 2011

Day 250 [+26]

Today saw the Plumbers return to site and install the bathtubs... if you can call what they did installing them.. the bathtups do not fit into the whole that was created for them.. something else for them to fix up.....

Brickie was also onsite setting up for monday to brick the top of the columns up. if the Carpenter fixed the problem... (doesnt look like they did as they still seem to be off.)

Friday, October 21, 2011

Day 249 [+25]

Nothing happened on site today a bit disapointing actually. As for the carpenters yesterday i am not sure if they actualy did anything...

Thursday, October 20, 2011

Day 248 [+24]

Not alot done during the day today, the carpeters (6 of them) arrived late afternoon (5pm) to fix a problem with the timber support beams on our balcony, apparently they were off centre and it is preventing the brickies from continuing the column up.

What concerns me is why was this not picked up months ago when the columns where first bricked up??

It does make me wonder what other problems there are with the house that have been missed


Busy working

Wednesday, October 19, 2011

Day 247 [+23]

By recent standards of work onsite it was a quiet day, Brickies returned to site today and continued the columns up the front of the house as well as building the stairs in the Garage.





Tuesday, October 18, 2011

Day 246 (Week 36) [+22]

Another Flurry of work onsite today with the Plumber and Electrician onsite fitting off the important stuff like Lights, Powerpoints toilets and taps.

The Brickies on the outside built our steps and fixed the bricks around the door as well as constructing a scaffold to continue the columns up


Front Stairs


Front Door 3rd Attempt

Stairs + Lights

Above Bench Lights...To Be changed after move in


Toilet (Dont use until Thursday!!)

 
Benchtop Powerpoint


Kitchen

Main Living/Dining


Ensuite Roof

Shower

Downlights

Return of the scaffold

Ensuite Basins



Monday, October 17, 2011

Day 245 [+21]

Plumber returned to site today with a delivery of bathtubs and toilets and to finish of most of the remaining downpipes.

New brown bricks were delivered to site for the front of the house and and other area that needs fixing.


Our Garage Door

New Bricks.....Again

Toilets and Baths

Stained Stair Railings

New Downpipe

Opps